![]()
Set 9
This specification is for use on buildings with existing
lightning protection systems that are being re-roofed. This specification
insures a system updated to current code criteria and compatibility.
| I. Frame Type | II. Bldg. Height | III. Material Req'd | IV. Use Spec Set |
| Either | Re-roof Project | As Required | Use Set 9 |
This specification serves as a supplement or addition
to any of the prior sets where the owner wishes to include a warning system
as part of the lightning protection system.
| I. Frame Type | II. Bldg. Height | III.Material req'd | IV. Use Spec Set |
| Either | Lightning Warning | Not Applicable | Use Set 10 |